House Construction Cost in Bangalore Per Sq. Ft.(2025)

House Construction Cost in Bangalore

Bangalore, the vibrant heart of India’s tech industry, is witnessing unprecedented growth in its real estate sector. As the city continues to evolve with new infrastructure projects and a thriving IT ecosystem, the demand for residential and commercial spaces is on the rise. However, this growth comes with challenges, particularly in managing house construction cost in Bangalore, which are increasingly influenced by inflation, material price hikes, and stringent regulatory requirements.

Calculating your house construction cost in Bangalore accurately is crucial to avoid financial setbacks and missed opportunities. If not done properly, homeowners and investors risk facing unexpected expenses that could derail their projects. The fear of missing out on timely investments or facing financial strain due to miscalculations is real, especially with rental yields growing at approximately 8-10% in the residential sector.

There are some elements that are very hard to miss when crafting a reliable and informative guide to building your dream home in this dynamic city. By understanding these in depth, you can navigate the complex landscape of Bangalore’s construction sector with confidence and make informed decisions to secure your future investments.

This guide provides a comprehensive overview of the current construction costs per square foot in Bangalore, focusing on key factors such as location-specific pricing, material quality, labor costs, architectural complexity, and government approvals.

What We'll Cover

House Construction Costs in Bangalore 2025

CategoryBasic ConstructionMid-Range ConstructionLuxury Construction
Material Costs₹1,200 – ₹1,500/sq ft₹1,600 – ₹2,000/sq ft₹2,500 – ₹3,500/sq ft
Interior Finishing Costs₹300 – ₹600/sq ft₹600 – ₹1,000/sq ft₹1,200 – ₹2,500/sq ft
Architect Fees5-10% of project cost8-12% of project cost10-15% of project cost
Approval and Legal Fees₹50 – ₹100/sq ft₹70 – ₹120/sq ft₹100 – ₹150/sq ft
Total Cost Estimate₹1,550 – ₹2,100/sq ft₹2,270 – ₹3,120/sq ft₹3,800 – ₹6,000/sq ft

Understanding The Types of House Construction

When considering construction in Bangalore, homeowners often align their projects with their lifestyle preferences. This involves choosing between basic, mid-range, or luxury construction options based on budget and desired amenities. Each category offers unique benefits, from affordability to high-end features.

Basic Construction

Approximately 30% to 40% of house construction projects in Bangalore fall into this category, as many homeowners seek affordable housing options. Basic home construction is more affordable due to the use of cost-effective materials and simpler designs. This segment is ideal for budget-conscious homeowners who prioritize functionality over luxury. 

Total Cost Estimate for Basic Home Construction: ₹1,200 to ₹1500 per square foot.

Mid-Range Construction

Mid-range construction offers better materials and finishes than basic construction, providing a comfortable living space. The higher cost is due to improved quality and design features. About 50% to 60% of construction projects in Bangalore are mid-range, as this category strikes a balance between quality and affordability, appealing to a wide range of homeowners.

Total Cost Estimate for Mid-Range Home Construction: ₹1,600 to ₹2000 square foot.

Luxury Construction

Luxury construction involves premium materials, advanced finishes, and often custom architectural designs. The high cost reflects the superior quality and unique aesthetics.

Approximately 10% to 20% of construction projects in Bangalore fall into this category, as luxury construction is typically sought by high-income individuals or those who value high-end living.

Total Cost Estimate for Luxury Home Construction: ₹2000 to ₹27350 per square foot.

These percentages are approximate and can vary based on market trends and economic conditions. However, they provide a general idea of how construction projects are distributed across these segments in Bangalore.

Detailed Cost Analysis for Each Construction Type

Understanding the various segments of construction costs is essential for effective budgeting. This includes material costs, labor charges, architect fees, and legal expenses, each contributing significantly to the overall project cost. By analyzing these segments, homeowners can make informed decisions tailored to their financial and lifestyle goals.

Material Costs

These vary significantly based on the quality and type of materials chosen. Luxury materials like high-quality cement, steel, and tiles are more expensive than standard ones. Factors such as sustainability and durability also influence material costs.

Interior Finishing Costs 

This includes expenses for painting, flooring, fixtures, and other decorative elements. Luxury finishes can significantly increase costs due to the use of high-end materials and intricate designs.

Architect Fees

Architects charge a percentage of the total project cost, which can range from 5% to 15% depending on the complexity and scope of the project. Their expertise is invaluable in optimizing space and ensuring structural integrity.

Approval and Legal Fees 

These include costs for obtaining necessary permits and approvals from local authorities. Luxury projects often require more complex approvals, leading to higher fees. Ensuring compliance with regulations is crucial to avoid legal issues.

Pre-Construction Costs

Before any physical construction begins, several crucial pre-construction expenses need to be factored into your budget. These are costs associated with land acquisition, legal requirements, and other necessary preparations. Understanding these costs will allow you to approach the project with a clear financial vision.

Land Acquisition

Land Acquisition refers to obtaining the land on which you intend to build. This cost varies widely depending on the location, size, and zoning regulations. Thorough research of market rates in your desired area is essential to avoid overpaying and secure a plot that fits your needs and budget.

Guidance Value

In Karnataka, the guidance value, also known as the circle rate, is the minimum value at which a property can be registered. This value is determined by the government to ensure fair transactions and revenue collection. It directly impacts the stamp duty and registration fees you will pay. It is worth noting that this value varies significantly by location; For example, in premium areas like Indiranagar, guidance value for residential sites can range from ₹1,71,800 to ₹2,08,900 per sqft.

Note: Registration must be based on at least the guidance value, and actual market value can be higher.

Registration Fees

Registration Fees are a mandatory fee charged by the government to register the property in your name. This process legally transfers ownership and protects your rights as the property owner. The amount is typically calculated as 1% of the property value.

Stamp Duty

Stamp duty is a tax levied on property transactions and varies based on the property value. It is a significant pre-construction expense that must be accounted for in your budget. In Bangalore, the rates are 5% of the property value for properties over ₹45 lakh, 3% for those between ₹21 lakh and ₹45 lakh, and 2% for those under ₹20 lakh.

Taxes and Charges

Taxes and charges are additional expenses you will incur, including the Goods and Services Tax (GST) for under-construction properties. GST rates are currently set at 5% for residential properties and 1% for affordable housing projects. Knowing this will give you a budget for what to save or what to spend.

Important Note: Be aware that GST is not applicable to ready-to-move-in homes.

A good and accurate estimation of all the fees will give you an insight into your spending. By accounting for these factors, you gain a more comprehensive understanding of the overall investment required to build your house, facilitating informed decisions that align with your financial goals.

For a residential property in Bangalore, with a value of ₹60 lakh, the pre-construction costs will be:

Registration Fees: 1% = Rs.60,000

Stamp Duty: 5%= Rs. 3,00,000

GST: 5%= Rs. 3,00,000

Therefore a total of 6,60,000 will be to be spent before the construction

Approval Costs for House Plan in Bangalore

When it comes to building a house in Bangalore, getting your plan approved by the local authorities is a crucial step. The two main bodies involved in this process are the Bruhat Bengaluru Mahanagara Palike (BBMP) and the Bangalore Development Authority (BDA). Here’s a breakdown of the combined costs you might incur for plan approval in both jurisdictions.

BBMP Plan Approval Fees

The application can be submitted BBMP’s online portal, and the process usually takes about 30 days if all documents are in order.

General Range: The BBMP plan sanction charges typically range from ₹20,000 to ₹80,000, depending on factors like site dimensions, built-up area, and whether the project is residential or commercial.

Recent Adjustments: The plan approval fee was reduced from 0.5% to 0.2% of the guidance value per square meter for residential properties, providing relief to homeowners.

BDA Plan Approval Fees

Applications can be submitted via the BDA online portal, and the process also takes about 30 days.

For BDA, the plan sanction charges can vary significantly based on the site size and development conditions. For example, a 30×40 site might cost between ₹1 lakh to ₹1.25 lakh for a three-floor permission, while a 40×60 site could cost between ₹1.75 lakh to ₹2.5 lakh.

BDA charges include a scrutiny fee, ground rent, development charges, and other applicable fees. The scrutiny fee is typically 0.0109% for single residential buildings and 0.09% for multi-dwelling units or commercial buildings.

These fees are subject to change based on updates in regulations and policies, so it’s important to check with the respective authorities for the most current information.

Combined Cost Estimate

The combined cost for plan approval from both BBMP and BDA can range from ₹1.2 lakh to ₹3.3 lakh, depending on the specific project requirements and site conditions. These fees are subject to change based on updates in regulations and policies, so it’s important to check with the respective authorities for the most current information.n. Additionally, BDA charges include scrutiny fees, development charges, and other applicable fees.

Example: Approval Cost for a 50×90 House Plan

Let’s consider a 50×90 feet house plan, which translates to approximately 4,500 square feet of land area. Assuming this is a residential project with a G+2 structure (Ground floor plus two floors), the approval costs might look something like this:

BBMP Plan Approval Fees: For a G+2 structure, the cost could be around ₹50,000 to ₹70,000, depending on the complexity and size of the project.

BDA Plan Approval Fees: If the property falls under BDA jurisdiction, additional fees might apply. These could include scrutiny fees, development charges, and other applicable fees, potentially adding another ₹20,000 to ₹30,000 to the total cost.

So, for a 50×90 house plan, the combined approval cost could range from ₹70,000 to ₹100,000. However, if we consider the possibility of higher BDA fees similar to those for larger sites (e.g., ₹1 lakh to ₹1.25 lakh), the total could be significantly higher, potentially between ₹1.5 lakh to ₹1.95 lakh.

What Documents Are Required for Plan Approval?

To successfully get your house plan approved in Bangalore, you’ll typically need the following documents:

  • Ownership Proof: Registered title deed.
  • Tax Receipts: Latest property tax payment receipts.
  • Khata Certificate & Extract: Legal status verification.
  • Site Plan & Building Plan: Architect-signed drawings.
  • NOCs: No Objection Certificates from BESCOM (electricity), BWSSB (water and sanitation), and KSPCB (pollution control board), if applicable.
  • Encumbrance Certificate: Ensures no legal liabilities on the property.
  • Other Documents: Possession certificate, Challan, Foundation Certificate, Schedule 2 of the National Building Organization (NBO), and Development charge receipt may also be required.

Streamlining Your Approval Process

  • Consult Licensed Architects/Engineers: Ensure your plans comply with local regulations. Hiring experienced professionals can help avoid common pitfalls and ensure all documentation is accurate.
  • Submit Documents Online: Use the BBMP or BDA online portals for faster processing. The online system streamlines the process and provides status updates.
  • Prepare Accurate Plans: Ensure the building plan includes all necessary details and adheres to building bylaws to avoid rejection.
  • Stay Updated: Check the official websites (BBMP and BDA) for any changes in fees or regulations.
  • Obtain NOCs Early: Secure No Objection Certificates from relevant departments (BESCOM, BWSSB, KSPCB) well in advance.
  • Follow Bangalore Building Byelaws: Adhere to building regulations to avoid rejection.
  • Engage Local Agents: Consider hiring agents to assist with paperwork and approvals. They are familiar with the process and can help navigate complexities.
  • Ensure all dues are clear: Make sure that your property tax, and other dues are paid up to date.

Breakdown of House Construction Cost in Bangalore

Now that we’ve covered the approval costs for your house plan in Bangalore, it’s time to get into the next critical phase, the civil construction costs. This stage involves transforming your approved plan into a physical structure, which includes laying the foundation, building the walls, installing roofing, and more. Following the civil construction phase, you’ll move on to the interior design and finishing touches, which will bring your home to life with elements like flooring, painting, and fixtures. In this section, we’ll focus on the civil construction costs, providing a detailed breakdown of what you can expect to pay for each component. This will help you plan and budget effectively for this crucial part of your home-building journey.Let’s break down the key components that contribute to the overall expense:

Cost of Core Construction Components:

Foundation: ₹2,12,000

This cost covers all the foundational work, including excavation to prepare the site, concrete laying for a strong base, and technical costs associated with ensuring the stability and load-bearing capacity of the structure. A well-constructed foundation is critical for the building’s longevity and safety.

Steel Structure (Footing, Column, Plinth): ₹55,000

This includes the structural framework using steel, starting from the footing (the base of the foundation) to the columns that support the building’s vertical load, and the plinth, which is the raised platform above ground level. Steel provides essential reinforcement to the concrete structure.

Roofing (Base to Staircases): ₹1,50,000

The roofing cost includes everything from laying the base for the roof to constructing staircases that provide access to different levels. This component ensures protection from the elements and ease of movement within the house.

Superstructure: ₹1,50,000

The “superstructure” refers to the part of the building above the foundation, including walls, beams, and columns. This cost adds to the overall structural integrity of the building, and supports the roof.

Walls (4 & 6-inch): ₹1,30,000

This cost is for constructing the walls using bricks, blocks, or other materials, typically with a thickness of 4 or 6 inches. The walls define the rooms, provide privacy, and contribute to the building’s insulation.

Tile Work (Flooring & Walls): ₹1,40,000

Expenditure of 1,40,000 should be expected. Tile work involves the installation of tiles for both flooring and walls, enhancing the aesthetics and providing a durable and easy-to-clean surface. The cost can vary based on the type of tiles (ceramic, porcelain, vitrified) and the complexity of the design.

Woodwork (Doors, Windows): Up to ₹4,35,000

Woodwork covers the installation of doors, windows, and related wooden fixtures. This can be a significant cost depending on the quality of wood, design, and whether you opt for custom-made or pre-fabricated options.

Painting (Exterior and Plastering): ₹2,90,000

This cost includes both interior and exterior painting, as well as plastering to create a smooth surface before painting. High-quality paint protects the building from weather damage and enhances its visual appeal.

Electrical & Plumbing: Up to ₹3,00,000

This covers the installation of all electrical wiring, fixtures, and plumbing systems. Costs depend on choices, but they should all be planned for the future.

Lift Installation (For Multi-Story Buildings): ₹4,00,000 to ₹15,00,000

For multi-story buildings, lifts could range from ₹4 lakh to ₹15 lakh. This is a substantial expense but can be essential for accessibility and convenience, especially for elderly or disabled residents.

Labour Cost for House Construction in Bangalore

When hiring labor contractors for house construction, there are different types of arrangements and pricing models to consider. Labor costs can vary depending on the scope of work, the type of labor hired, and the payment structure. Here’s a detailed explanation:

Types of Labor Arrangements

Contractual Basis

In this arrangement, the labor contractor charges a fixed rate per square foot for all civil works. The owner is responsible for supplying all materials (cement, steel, sand, etc.).

The contractor handles tasks like brickwork, plastering, bar bending, concreting, and other civil-related activities.

Rates: ₹230 to ₹350 per square foot (depending on the complexity and quality of work).

Day-to-Day Wagers

Workers are hired on a daily wage basis. This is suitable for small-scale or short-term projects.

The owner must manage and supervise the work daily and ensure materials are available on-site.

Daily Rates:

  • Mason: ₹600 – ₹800/day
  • Helper (Male): ₹350 – ₹580/day
  • Helper (Female): ₹300 – ₹500/day
  • Carpenter/Plumber: ₹600 – ₹900/day
  • Painter/Tile Layer: ₹500 – ₹900/day 
Hybrid Model

A combination of contractual and daily wage labor is used. For example, civil works may be done on a per-square-foot basis, while specialized tasks like electrical or plumbing are handled by daily wagers.

Architect Fees

Hiring an architect is a smart move for clear plans. It ensures things run smoothly. The same goes for hiring experts like contractors and engineers. They keep things on track and understand what the project needs. Architect fees can vary based on project scope, complexity, and the architect’s experience.

Typical Architect Fees Structure:

Percentage of Construction Cost

Architects may charge a percentage of the total construction cost, usually ranging from 5% to 15%. The exact percentage depends on the project’s complexity, scope of services provided, and the architect’s reputation.

Example: For a project with a construction cost of ₹50 lakhs, an architect charging 8% would have a fee of ₹4 lakhs.

Per Square Foot Rate

Some architects charge a fee per square foot of the built-up area.

Rate: ₹50 to ₹200 per square foot, depending on design complexity and material specifications.

Lump Sum Fee

A fixed fee is agreed upon for the entire project, irrespective of the construction cost or square footage.

This structure is common for well-defined projects with clear scope.

Hourly Rate

Architects may charge an hourly rate for consultation and design services.

Rate: ₹1,000 to ₹5,000 per hour, depending on the architect’s experience and expertise.

Interior Design Costs in Bangalore

Once the civil construction is complete, many homeowners in Bangalore choose to add the final touch with interior design. While it’s not a mandatory step, a significant percentage of Bangaloreans opt for professional interior designers In Bangalore to create a functional and aesthetically pleasing living space. Estimates indicate that approximately 70-80% of new homes in Bangalore incorporate some form of interior design beyond the basic civil construction. This can range from modular kitchens and wardrobes to complete home makeovers with custom furniture and lighting. Let’s explore the typical costs involved, keeping in mind that these are estimates to help with your budgeting and may not apply to everyone.

Interior Designing Cost Per Square Foot in Bangalore

Interior designers in Bangalore charges their fees based on multiple factors such as the type of project (new construction or renovation), the scope of work, materials used, and the level of customization. Here’s a clear breakdown to help you understand how interior designing cost calculation works:

Type of Interior DesignCost Range (₹/sq. ft.)
Basic Interiors₹1,500 – ₹2,000
Standard Interiors₹2,000 – ₹3,000
Premium/Luxury Interiors₹3,000 – ₹5,000

How Project Duration Influences the Surge in Construction Cost

The duration of a construction project has a significant impact on its overall cost. Prolonged timelines often lead to budget overruns due to various factors. Understanding these reasons and implementing strategies to avoid them is crucial for successful project management.

Reasons for Cost Surge Due to Extended Project Duration

Material Price Escalation

Construction materials like steel, cement, and aggregates are subject to market fluctuations. A longer project duration increases the risk of price hikes, directly impacting the budget.

If steel prices rise by 10% during a 12-month delay, the material cost for structural components increases proportionally.

Labor Cost Inflation

Labor rates can increase over time due to inflation, market demand, or union agreements. Extending the project duration means paying higher wages for a longer period.

If labor rates increase by 5% annually, a one-year delay results in an additional 5% expenditure on labor costs.

Equipment Rental Expenses

Construction equipment like cranes, excavators, and concrete mixers are often rented. Longer project durations mean higher rental fees.

Example: Renting equipment for an extra six months can significantly increase the project’s overhead costs.

Site Overhead Costs

Site-related overhead costs, such as security, temporary utilities (water, electricity), and site management, are time-dependent. The longer the project lasts, the higher these expenses become.

Example: Security costs of ₹50,000 per month translate to an additional ₹6,00,000 for a one-year delay.

Interest and Financing Charges

Construction projects are often financed through loans. Longer durations result in higher interest payments and financing charges.

Example: An extended project duration could mean additional interest accrual, increasing the overall cost of financing.

Storage Costs

If materials need to be stored for extended periods due to project delays, additional storage costs can arise.

Example: Renting storage space can cost ₹10,000 to ₹20,000 per month, depending on the quantity of materials.

Unexpected Delays and Rework

Extended timelines increase the chances of unexpected delays (e.g., weather, regulatory issues, supply chain disruptions). These delays can lead to rework, further driving up costs.

How to Avoid Home Construction Cost Surges Due to Extended Project Duration

Detailed Project Planning

Create a comprehensive project plan with realistic timelines, milestones, and resource allocation.

Clearly define the scope of work to minimize scope creep and avoid rework.

Accurate Cost Estimation

Develop a detailed cost estimate that accounts for potential price escalations and contingencies.

Regularly review and update the cost estimate based on market conditions and project progress.

Effective Project Management

Implement effective project management practices to monitor progress, identify potential delays, and take corrective actions promptly.

Regularly communicate with stakeholders to keep everyone informed and aligned.

Supply Chain Management

Establish reliable relationships with suppliers and negotiate favorable pricing agreements.

Monitor material prices and availability to anticipate potential shortages or price increases.

Risk Management

Identify potential risks and develop mitigation strategies to minimize their impact on project duration and cost.

Include contingency plans for unexpected delays or disruptions.

Contractual Agreements

Draft clear and comprehensive contracts with all parties (contractors, suppliers, subcontractors) to define roles, responsibilities, and timelines.

Include clauses for delay penalties and incentives for timely completion.

Protecting against unexpected delays is crucial. So, having contracts that include penalties if the project completion timeline is breached is vital.

Regular Monitoring and Control

Monitor project progress regularly using project management tools and techniques.

Track actual costs against the budget and take corrective actions to address any variances.

Implement change control procedures to manage scope changes and their impact on cost and schedule.

Optional and Variable Costs in Building a House

Beyond the core construction costs, several optional and variable factors can significantly influence the overall expense of building a house. Understanding these elements allows for a more tailored and realistic budgeting approach.

Here’s a breakdown:

Lift or Escalator Installation (Multi-Story Buildings)

Installing a lift or escalator can add considerable convenience and accessibility to multi-story homes in Bangalore.

Cost Range: Lifts typically range from ₹4,00,000 to ₹15,00,000, depending on factors like capacity, design, features, and brand.

Project Location

The location of the construction site in Bangalore has a substantial impact on costs due to variations in labor rates, material availability, transportation expenses, and regulatory requirements.

Urban vs. Rural Areas: Central Bangalore urban locations generally incur higher labor costs, stricter building codes, and increased material transportation costs compared to rural areas.

Accessibility: Difficult-to-access sites may require additional equipment and logistical planning, further increasing expenses.

Local Regulations: Different municipalities in Bangalore have varying permit fees and compliance costs.

Inflation

Inflation erodes the purchasing power of money over time, impacting the cost of materials, labor, and other project-related expenses.

Material Prices: Construction materials such as cement, steel, wood, and aggregates are subject to market fluctuations and inflationary pressures.

Labor Rates: Labor rates tend to increase over time due to inflation, skill shortages, and local demand.

Mitigation: To account for inflation, consider the following strategies:

  • Include an inflation contingency in the project budget.
  • Negotiate fixed-price contracts with suppliers and contractors, where possible.
  • Closely monitor market trends and material prices to adjust procurement strategies.

Detailed Chart of House Construction Cost in Bangalore

Having explored the various components of building a home in Bangalore, from pre-construction expenses to core construction costs and optional additions, it’s time to consolidate this information into a practical overview. The following chart provides a comprehensive look at the estimated costs involved in building a home, based on different plot sizes and building plans. Consider this your reference point for budgeting and planning your dream home, with all the key factors now clearly presented.

Plot DimensionBuilding PlanPlot Area
(sq ft)
Built-up Area Basic Construction CostMid-Range Construction CostEstimated Additional Charges (Approvals, Borewell, Sump, etc.)
20 x 30 FeetGround Floor Only (G)600540₹8.37L – ₹11.34L₹12.26L – ₹16.85L₹3.00L – ₹4.00L
20 x 30 FeetGround + 1 Floor (G+1)6001080₹16.74L – ₹22.68L₹24.52L – ₹33.70L₹3.50L – ₹4.50L
20 x 30 FeetGround + 2 Floors (G+2)6001620₹25.11L – ₹34.02L₹36.77L – ₹50.54L₹4.00L – ₹5.00L
20 x 30 FeetGround + 3 Floors (G+3)6002160₹33.48L – ₹45.36L₹49.03L – ₹67.39L₹4.50L – ₹6.00L
20 x 30 FeetGround + 3.5 Floors (G+3.5)6002430₹37.66L – ₹51.03L₹55.16L – ₹75.82L₹4.50L – ₹6.00L
15 x 40 FeetGround Floor Only (G)600540₹8.37L – ₹11.34L₹12.26L – ₹16.85L₹3.00L – ₹4.00L
15 x 40 FeetGround + 1 Floor (G+1)6001080₹16.74L – ₹22.68L₹24.52L – ₹33.70L₹3.50L – ₹4.50L
15 x 40 FeetGround + 2 Floors (G+2)6001620₹25.11L – ₹34.02L₹36.77L – ₹50.54L₹4.00L – ₹5.00L
15 x 40 FeetGround + 3 Floors (G+3)6002160₹33.48L – ₹45.36L₹49.03L – ₹67.39L₹4.50L – ₹6.00L
15 x 40 FeetGround + 3.5 Floors (G+3.5)6002430₹37.66L – ₹51.03L₹55.16L – ₹75.82L₹4.50L – ₹6.00L
30 x 40 FeetGround Floor Only (G)12001080₹16.74L – ₹22.68L₹24.52L – ₹33.70L₹3.00L – ₹4.00L
30 x 40 FeetGround + 1 Floor (G+1)12002160₹33.48L – ₹45.36L₹49.03L – ₹67.39L₹3.50L – ₹4.50L
30 x 40 FeetGround + 2 Floors (G+2)12003240₹50.22L – ₹68.04L₹73.55L – ₹101.09L₹4.00L – ₹5.00L
30 x 40 FeetGround + 3 Floors (G+3)12004320₹66.96L – ₹90.72L₹98.06L – ₹134.78L₹4.50L – ₹6.00L
30 x 40 FeetGround + 3.5 Floors (G+3.5)12004860₹75.33L – ₹102.06L₹110.32L – ₹151.63L₹4.50L – ₹6.00L
60 x 40 FeetGround Floor Only (G)24002160₹33.48L – ₹45.36L₹49.03L – ₹67.39L₹3.00L – ₹4.00L
60 x 40 FeetGround + 1 Floor (G+1)24004320₹66.96L – ₹90.72L₹98.06L – ₹134.78L₹3.50L – ₹4.50L
60 x 40 FeetGround + 2 Floors (G+2)24006480₹100.44L – ₹136.08L₹147.10L – ₹202.18L₹4.00L – ₹5.00L
60 x 40 FeetGround + 3 Floors (G+3)24008640₹133.92L – ₹181.44L₹196.13L – ₹269.57L₹4.50L – ₹6.00L
60 x 40 FeetGround + 3.5 Floors (G+3.5)24009720₹150.66L – ₹204.12L₹220.64L – ₹303.26L₹4.50L – ₹6.00L

Disclaimer: Costs mentioned are approximate and may vary based on location, material rates, labor charges, and market conditions at the time of your project. Always consult with your architect or contractor for the most accurate estimate.

Note:

Apart from the main construction cost, there are a few additional expenses to keep in mind. We have included things like plan approvals, BESCOM (electricity) charges, and water connections. But, if you’re planning a multi-floor home, you’ll also need to consider the cost of installing a lift, which can add significantly to the budget.

It’s also wise to keep a contingency fund aside, around 5–10% of your total cost, for unexpected expenses during the construction journey.

That’s a Wrap

Building a home in Bangalore is a significant investment, requiring careful planning and a clear understanding of the various cost factors involved. From acquiring land and securing necessary approvals to laying the foundation and adding the finishing touches, each phase contributes to the overall expense.

We’ve explored pre-construction costs like land acquisition, registration, and stamp duty, as well as core construction components such as the foundation, steel structure, roofing, and finishes. We’ve also touched on approval processes, labor costs, and the importance of engaging experienced architects and contractors.

Remember that construction costs in Bangalore can vary widely based on factors like location, material quality, design complexity, and market conditions. As of 2025, you can generally expect basic construction to range from ₹1,200 to ₹1,600 per sq ft, mid-range construction from ₹1,800 to ₹2,000 per sq ft, and luxury construction from ₹2,100 to ₹2,750 per sq ft.

Ultimately, successful home construction in Bangalore hinges on thorough planning, realistic budgeting, and partnering with reliable professionals who can guide you through the complexities of the process. By staying informed and proactive, you can confidently navigate the construction landscape and bring your dream home to life. 

FAQs

What is the average house construction cost in Bangalore?

The average construction cost in Bangalore depends on the project’s scope and quality. basic construction to range from ₹1,200 to ₹1,600 per sq ft, mid-range construction from ₹1,800 to ₹2,000 per sq ft, and luxury construction from ₹2,100 to ₹2,750 per sq ft. These estimates do not include land, pre-construction, or interior design expenses, so, make sure to make sure you include that into the estimation.

What is the construction cost for a 25×35 duplex house in Bangalore?

A 25×35 site is 875 sqft. A duplex (G+1) provides around 1750 sqft of space. Budget costs that the construction can range from approximately ₹39,72,500 for basic construction to around ₹54,50,000 for higher end construction, please note that this is exclusive to labour costs. Basic, mid-range, or luxury materials should be considered.

What is the construction cost per sq. ft. in Bangalore?

The cost of construction in Bangalore (per sq. ft.) ranges from ₹1,550 to ₹2,100 for Basic projects, ₹2,270 to ₹3,120 for Mid-Range projects, to ₹3,800 to ₹6,000 for luxury homes. As a baseline, all costs related to civil work should be considered along with pre-construction costs with government approval and so forth. This does not include labour costs.

How much does a 1200 sq. ft. house construction cost in Bangalore?

The approximate cost for a 1200 sq. ft. house construction cost in Bangalore will be 1,860,000-2,520,000 rupees for a basic project construction. Similarly, the cost will go up to approximately 2,724,000-3,744,000 rupees for mid range constriction. For Luxury Construction, the final cost will depend on your design and needs based on customization.

What is the construction cost of a 4-floor building in Bangalore?

The construction cost of a 4-floor building in Bangalore depends on the super built area and the quality of construction. For a 30×40 site (1200 sq ft), consider the number of floors. Construction costs are ₹18 lakhs for a ground floor and increase by the same amount for each additional floor. For a 4-floor (G+3) structure, the costs can go up to ₹72 lakhs, at an estimated ₹1550, excluding labour, and more.

How much does it cost to construct the 1st floor in an existing building in Bangalore based on total area size?

The cost of constructing the 1st floor in an existing building in Bangalore generally ranges between ₹18 lakhs to ₹25 lakhs for a 1,000-square-foot area. This cost typically translates to ₹2,500 to ₹4,000 per square foot, influenced by factors like structural requirements, quality of materials, interior finishes, and overall design complexity.